Which Kilimanjaro Route Should You Climb?
The routes differ mainly in acclimatisation profile, traffic and whether you sleep in huts or tents. Here is how they compare.
Last updated

Every route ends at the same place. They differ in how long you take to get there, how busy the trail is, what you sleep in, and what you look at on the way.
The single most important variable is time. Altitude is the main reason people don't summit, and more days spent gaining height slowly is the most reliable thing you can do about it. If you're choosing between a shorter and a longer version of the same route, the longer one is almost always the better decision.
Marangu
The oldest and most established route, and the only one with huts instead of tents. Its gradient is gentle, which is why it has a reputation as the easy option. But it also goes up and down by the same path and offers less of the "climb high, sleep low" pattern that helps acclimatisation.
Sensible if you would rather sleep in a bunk than a tent, or are climbing in a wetter month. We run it over five days and six. The six-day version adds an acclimatisation day at Horombo and is the better choice if you can spare the day.
Machame
The most popular route, and busy as a result. It is steeper and more varied than Marangu, camping throughout, with a much better acclimatisation profile because of the way it crosses high and drops to camp.
We run it over six days and seven. The seven-day version splits the Barranco to Barafu leg across two days, which leaves a much shorter day before the summit push. That is a real difference on the night that matters.
Rongai
The only approach from the north, near the Kenyan border. Drier than the southern routes, which makes it a reasonable choice in wetter months, and much quieter than Machame or Marangu. Scenically it's more understated until high on the mountain. Our version runs over seven days.
Lemosho
The most scenic of the routes we run, starting through rainforest on the western side and crossing the Shira Plateau before joining the southern circuit. It has the longest acclimatisation profile of our routes, which is the main reason to choose it. Our version runs over eight days.
Choosing
- Most days to acclimatise: Lemosho over eight days.
- Quietest trail: Rongai.
- Huts, not tents: Marangu, and take the six-day version.
- Best balance of scenery, profile and cost: Machame over seven days.
A word on preparation
Kilimanjaro is a walk, not a technical climb, but altitude affects people unpredictably and fitness isn't a reliable predictor of who is affected. Anyone with a relevant medical history should take proper medical advice before booking, and should follow their guide's judgement on the mountain without argument. We aren't qualified to give medical guidance and won't pretend otherwise.
















