Safaris
Kilimanjaro
Destinations
Experiences
Travel guide
About
Contact Call +255 764 006 061 Plan Your Safari
Kilimanjaro · 5 min read

Combining Kilimanjaro with a safari

Most climbers add a safari, and the order, the rest day and the route between mountain and parks decide how well the two fit. A plain guide to putting them together.

The mountain and the northern parks are next to each other. Arusha, the safari town, is an hour from the Kilimanjaro airport and two hours from the first park. So most people who climb Kilimanjaro add a safari, and most people who come for a safari at least think about the mountain. Putting the two together is easy if you get three things right: the order, the rest day, and the length of each half.

This page covers those three things and the shapes that work. For the safaris themselves, see the safari pages.

Itineraries

Kilimanjaro climbs we run

Compare all routes
Trekkers walking a path through low heath toward Kilimanjaro's long summit ridge.

At a glance

Order
Climb first, safari second. Almost always.
Rest
At least one night in Moshi or Arusha between them. Two is better.
Safari length
Four days is the minimum that reaches the Serengeti. Six is where it stops feeling rushed.
Total
A seven-day climb plus a rest day plus a six-day safari is about two weeks. Add Zanzibar for three.
Where the halves meet
Arusha. The mountain is an hour east, Tarangire is two hours west.
Flights
Land at Kilimanjaro International for both. Fly home from there, or from Zanzibar.
Climbers in heavy jackets walking across snow near the summit.

Climb first

The climb is the tiring half. You finish it exhausted, with sore legs and a week of broken sleep behind you. A safari is the opposite: early starts, but you sit in a vehicle, eat well and sleep in a bed. Doing them in that order lets the safari be the recovery.

There is a practical reason too. If the climb runs over, because of weather or an extra rest day, it eats into the safari. If the safari came first and ran over, it would eat into the climb, and a climb cannot be shortened without changing the route.

And a flight. If the climb is last and runs late, you miss the plane. If the safari is last and runs late, you miss a game drive.

Trekkers picking their way across dark volcanic rock toward Kibo's snow-streaked summit.

The rest day

Leave at least one night between coming off the mountain and starting the safari. Two is better.

You come down to the gate around midday on the last day of the climb, reach your hotel by mid-afternoon, and want nothing but a shower, a meal and a bed. Starting a safari the next morning at seven is possible and nobody enjoys it. Starting it the morning after that is a different experience.

Use the day for nothing, or for a gentle day trip near Moshi or Arusha: hot springs, a waterfall, a coffee farm. The day trips on this site are built for exactly this gap.

Green and yellow tents in a high camp below the snow-streaked summit of Kibo.

How long each half should be

Do not shorten the climb to make room for the safari. A seven or eight-day route is the one that gets you to the top. Five days to save time is the most common way to fail.

On the safari side, four days reaches the Serengeti and the crater and nothing else. Six days gives the Serengeti a full day with two nights around it and the crater a day of its own. Eight or nine days stops compromising. Which you choose depends on time and budget, but four is the floor.

A typical combination is a seven-day climb, a rest day, and a six-day safari: fourteen days on the ground, plus travel. Add three or four nights on Zanzibar and it becomes a three-week trip.

Climbers with heavy packs pausing on rocks high on the mountain.

Shapes that work

The two-week trip. Land at Kilimanjaro, a night in Moshi, seven days on Machame, a rest night in Moshi, drive to Arusha, six days on the northern circuit, fly home from Kilimanjaro airport.

The three-week trip. The same, then fly from the Serengeti or Arusha to Zanzibar for three or four nights, and fly home from there. Check the international routing from Zanzibar when you book flights.

The short version. A six-day Machame or Rongai climb, a rest night, and a four-day safari. Ten days on the ground. It works if that is all the time there is. The climb is the part not to cut further.

The long version. Eight-day Lemosho or the nine-day Northern Circuit, two rest nights, and an eight or nine-day safari with Ndutu or the far north. About three weeks, and the best of both.

The sun setting behind a jagged peak, seen from high on the mountain's snowy slopes.

Packing for both

The climb and the safari want different things, and one bag has to carry both.

The climb needs warm layers, a sleeping bag, boots and poles. The safari needs light neutral clothes, a fleece for the cold mornings, and a sun hat. The overlap is bigger than it looks: the fleece, the shell, the hat, the sun cream and the daypack all do both jobs.

Most people leave the mountain kit at their Moshi or Arusha hotel during the safari and collect it on the way to the airport. Ask the hotel. It is a normal request. If you are flying any safari leg, the light-aircraft limit is around 15 kilograms in a soft bag, and the mountain gear needs to stay behind for that reason too.

A camp of tents spread across a rocky slope, with Kibo's snow and cloud above.

Booking both together

Book the climb and the safari with one operator if you can. The transfer between the two is then one company's problem, the rest day is built in, and there is one person to call if anything changes.

Say at the start that you want both. The climb dates set the safari dates, and the safari camps in the peak months need booking early. A combined enquiry gets the whole thing planned once, in the right order.

Questions

Should I climb Kilimanjaro before or after a safari?
Before. The climb is tiring and the safari is the gentle recovery. If the climb runs over it costs a safari day, not a flight home.
How many days between the climb and the safari?
At least one night in Moshi or Arusha. Two is better. Starting a safari the morning after coming off the mountain is possible and unpleasant.
How long should the safari be after a climb?
Four days is the minimum that reaches the Serengeti and the crater. Six days is where it stops feeling rushed. Do not shorten the climb to make room. Shorten the safari if you must.
Can I add Zanzibar?
Yes. Fly from the Serengeti or Arusha to Zanzibar after the safari, stay three or four nights, and fly home from there. It turns a two-week trip into three.
What do I do with my mountain gear during the safari?
Leave it at your hotel in Moshi or Arusha and collect it on the way to the airport. Hotels are used to the request. Light aircraft on safari have a 15-kilogram soft-bag limit.
Should I book the climb and the safari together?
Yes, with one operator where possible. The transfer and the rest day are then built in, and the safari camps for peak months can be booked early around the climb dates.
Keep reading

Other guides

All guides

Still have a question?

Ask us directly — we answer every message ourselves.

Talk to a safari expert on WhatsApp (opens in a new tab)